From crate to first wafer: tool move-in and hook-up, step by step.

A new line installs its tools in waves. Each tool walks the same nine steps, and each step has a different owner.

In brief
  • Move-in puts the tool on its pedestal; hook-up connects it to every utility.
  • Leak and safety checks gate power-on. Nothing is skipped.
  • Vendor acceptance proves the tool; process qualification proves your recipes.
  • Your technicians should be there from move-in, not from release.
  1. 01ArrivalCrates received and inspected.
  2. 02Move-inRigged into the cleanroom.
  3. 03Set and levelOn its pedestal, levelled.
  4. 04Hook-upPower, water, exhaust, gases, chemicals, vacuum.
  5. 05Leak and safety checksEvery joint tested and signed off.
  6. 06Power onFirst start-up by the vendor.
  7. 07AcceptanceTool meets its vendor specification.
  8. 08Process qualificationRuns your recipes to your specification.
  9. 09ReleaseHanded to production.
Fig. 01Nine steps from arrival to release. The lit station steps through the sequence.

Who owns which step

StepUsually owned byWhere delays start
Arrival, move-in, setTool vendor with riggersAccess routes and floor loading not ready
Hook-upLicensed hook-up contractorUtility points not commissioned
Leak and safety checksContractor and fab safety teamDocuments incomplete at sign-off
Power-on and acceptanceTool vendorSpares or consumables missing
Process qualificationFab process and equipment engineersEngineers or certified operators not yet hired

Where we fit

Hook-up design and execution belong to licensed contractors. We staff the crews and project leads around them, track readiness across all tools, and make sure your own technicians learn each tool while it is being installed. Ramp support.